406 Electrical Installations

Finalists

  • Niko Hällback, Etelä-Savon ammattiopisto
  • Arttu Koivisto, Ammattiopisto Lappia
  • Jaakko Korhonen, Ylä‐Savon ammattiopisto
  • Juho Lehtinen, Novida-ammattiopisto ja lukio
  • Antton Peltokangas, Oulun seudun ammattiopisto
  • Pyry Savinen, Keski-Uudenmaan koulutuskuntayhtymä Keuda
  • Oskari Teräväinen, Tampereen seudun ammattiopisto Tredu
  • Jalmari Väistö, Pohjois-Karjalan koulutuskuntayhtymä Riveria

 

Competition task structure and central task module components

Task 1. and 2. Electrification of a service module and an office

Task 3. Electrical network installation

Task 4. Changing the electrification and parameterization of the electrical control system

  • The target of installation is the electrification of a service module and an office. Electrical switchboards, wire ways, lightning, sockets and the steering system of both lightning and electric drive are installed to the property so that they are ready for use. In outside areas the competitor performs installations of underground cables, distribution switchboard and outdoor lightning.
  • The installations are made either on the surface of the material or as mortise installations. Electrical piping, cable ladders, nail and screw clamps and channel or trunking installation can be used as wire ways.
  • Main areas of assessment are: Work safety and electrical work safety, commissioning, testing and operation, measurements and appearance, installation of devices and wire ways, wiring and junctions, customer service and documentation, sustainable development and entrepreneurship/attitude.

 

Main assessment criteria

  • Work and electrical safety 15 %
  • Commissioning, testing and operation 23 %
  • Measurements and appearance 20 %
  • Installation of devices and wire ways 10 %
  • Wiring and connections 12 %
  • Customer service and documentation 15 %
  • Sustainable development, entrepreneurship and attitude to working 5 %

 

Competition task assessment criteria

  • Task 1: 30 % / 30 points
  • Task 2: 30% / 30 points
  • Task 3: 20 % / 20 points
  • Task 4: 20 % / 20 points

 

Description of the assessment process

The tasks are modular so that the daily results can be assessed separately. The scoring system is the CIS marking system, which has a maximum total score of 100 points. The results are announced by module. The competition performance is assessed at the end of each module. The judges assess the competitors during the competition by monitoring them and measuring the accuracy of measurements of the finished product and the accordance with the drawings.

Should the competitor present a risk to the competitor’s or others’ safety, the competition performance may be interrupted.

 

Materials, equipment and work phases used and the competition area

  • the competition area is 406, Electrical installations, inside and outside area
  • cabling and fastening of other installations supplies is performed onto board surfaces, cable trays and lighting rack. The surface material of the board is painted wood.
  • in the outside area installations are performed from the ground or aerial lift
  • there are 9 workstations in the competition area, one of which is reserved for international competitors
  • task 1. is performed on the first say
  • task 2. and 3. are performed on the second day
  • task 4. is performed on the third day

 

What the competitor brings to the competition venue

The competitor brings personal protective equipment, appropriate work clothing with safety colours, hand tools, a battery-powered drill, and the commissioning meter and other necessary measuring devices needed. For marking the cables, the competitor must bring a label printer, a marking pen and cable marking supplies.

 

Sample task and assessment as a whole

You can load advance tasks here. The jury reserves the right to change max. 30% of the tasks on the competition site, before the start of the competition.

 

Words in drawings

POHJAKUVA = THE PLAN

  • Uudisrakennus = new Building
  • Sähköpiirustus = electrical drawing
  • Taitaja2019 sähköasennuslaji 406 = Taitaja2019 the skill category Electrical Installations
  • Pohjapiirustus = layout / plan
  • Työnumero = work number
  • Tilaajan numero = subscriber number
  • Piirustusnumero = drawing number
  • Muutos = change
  • RK 1= Distribution board 1
  • RK 2 = Distribution board 2
  • LED-nauha = LED strip

ULKOALUE 1 = OUTSIDE AREA 1

  • Uudisrakennus = new building
  • Sähköpiirustus = electrical drawing
  • Taitaja2019 sähköasennuslaji 406 = Taitaja2019 the skill category Electrical Installations
  • Työnumero = work number
  • Tilaajan numero = subscriber number
  • Piirustusnumero = drawing number
  • Muutos = change

ULKOALUE 2 = OUTSIDE AREA 2

  • esim. = for example
  • Uudisrakennus = new building
  • Sähköpiirustus = electrical drawing
  • Taitaja2019 sähköasennuslaji 406 = Taitaja2019 the skill category Electrical Installations
  • Työnumero = work number
  • Tilaajan numero = subscriber number
  • Piirustusnumero = drawing number
  • Muutos = change

 

Judges

  • Main judge Seppo Kuusikko, OSAO
  • Pasi Kuusela, Gradia
  • Vesa Hirvenlahti, Gradia
  • Kimmo Karppanen, Sähköasennus Mirotex Oy
  • Anssi Puumalainen, Lieksan Sähkö Oy
  • Mika Tamminen, Ammattiopisto Tavastia
  • Raimo Thornberg, Kainuun ammattiopisto
  • Antti Heikura, Enerke Oy
  • Ville Rissanen, Enerke Oy
  • Sakari Hannikka, ABB Oy
  • Matti Kinnunen, Sähköliitto
  • Hannu Husso, Ylä-Savon ammattiopisto

Taitaja Competition enables the develompent of competence and competence demonstration for the competitors. The judges of the skill categories will give feedback to the competitors during the competition and they will also evaluate the competition tasks. The presentations and ideas created during the competition are in the public domain and can be used by an individual or an enterprise. The presentations and ideas can be used as they are or further developed. The Taitaja2019 event is mainly publicly funded from the semifinals to the finals. The materials produced during the event are openly availabe without any usage fees.